Image 1 of 1

Bayou Bridge Pipeline in LA11.jpg

Atchafalaya Basinkeeper, Dean Wilson measuring the pipeline right-of-way in the basin already cleared by workers employed by the Bayou Bridge Pipeline LLC.
The permit allows a 75 foot wide pipeline right-of-way, which it can clear before construction of the pipeline. Wilson measured the pipeline right-of-way in three spots that have been cleared in the basin on land owned by the state and found the company cleared more than 80ft across.
Copyright
©2018 Julie Dermansky
Image Size
4000x2667 / 4.8MB
Contained in galleries
Bayou Bridge Pipeline
Atchafalaya Basinkeeper, Dean Wilson measuring the pipeline right-of-way in the basin already cleared by workers employed by the  Bayou Bridge Pipeline LLC. <br />
The permit allows a 75 foot wide pipeline right-of-way, which it can clear before construction of the pipeline. Wilson measured the pipeline right-of-way in three spots that have been cleared in the basin on land owned by the state and found the company cleared more than 80ft across.