Image 1 of 1

Bayou Bridge Pipeline Route 08.jpg

Tree toppled over durring the instalation of on the Bayou Bridge pipeline on a spoil bank r along the route of the Bayou Bridge Pipeline. in the he Atchafalaya Basin. A federal judge issued a temporary injunction that stopped the work on the pipeline on Febuary 24, 2017.
Copyright
©2018 Julie Dermansky
Image Size
4000x2667 / 3.9MB
Contained in galleries
Bayou Bridge Pipeline
Tree toppled over durring the instalation of on the Bayou Bridge pipeline on a spoil bank r along the route of the Bayou Bridge Pipeline. in the he Atchafalaya Basin. A federal judge issued a temporary injunction that stopped the work on the pipeline on Febuary 24, 2017.